Privatization Implementations of Power Plants

The Electricity Market Law No.4628 became effective in 2001 and stipulated the principles of the Turkish electricity market. Within this framework, on 17.3.2004 the Electricity Energy Sector Reform and Privatization Strategy Paper (“2004 Strategy Paper”) and on 18.5.2009 the Electricity Energy Market and Supply Security Strategy Paper (“2009 Strategy Paper”) depicting the road map for the liberalization and security of supply in the market, were publicized. Subsequently, new Electricity Market Law No.6446 became effective on 30.03.2013 because of   developments in the sector .

Completed Privatization Process (Plants of EUAS)

As per decision of the Privatization High Council dated 27.12.2006 and numbered 2006/100, it has been decided that Tercan, Kuzgun, Mercan, İkizdere, Çıldır, Ataköy, Beyköy Hydroelectric Power Plants (HPPs) and Denizli Geothermal Power Plant and Engil Gas Turbine Power Plant shall be included in the scope and program of privatization. The aforesaid power plants have been incorporated into Ankara Natural Electricity Generation and Trade Co.Inc. whose equity is wholly owned by the PA and the privatization of 9 Power Plants with a total installed capacity of 141 MW was concluded in 2008.

In 2009, as per decision of the Privatization High Council dated 19.10.2009 and numbered 2009/59, it has been decided that 56 Run-of-River Power Plants shall be included in the privatization program and privatized via the “Transfer of Operating Rights” method. The Run-of-River Power Plants were grouped into 19 portfolios, but the tender of Koyulhisar HPP in portfolio-12 did not go ahead because the plant is located in the disaster area. The tender process for 18 portfolios with a total installed capacity of approximately 140 MW has been concluded as of June 2010 and the tenders have been approved by the decisions of HPB. Transfers of 10 portfolios of the aforesaid Run-of-River Power Plants have been realized, tenders of 8 portfolios (2,3,6,7,8,15,18 and 19) have been cancelled .

The abovementioned 19 portfolios are set out below:

Group 1               : İznik-Dereköy, İnegöl-Cerrah, M.Kemalpaşa-Suuçtu

Group 2               : Haraklı-Hendek, Pazarköy-Akyazı, Bozüyük

Group 3               : Kayaköy

Group 4               : Kovada I, Kovada II

Group 5               : Turunçova-Finike

Group 6               : Anamur, Bozyazı, Mut-Derinçay, Silifke, Zeyne

Group 7               : Bozkır, Ermenek, Göksu

Group 8               : Dere, İvriz

Group 9               : Kayadibi,

Group 10             : Bünyan, Çamardı, Pınarbaşı, Sızır

Group 11             : Değirmendere, Karaçay, Kuzuculu

Group 12             : Koyulhisar, Ladik-Büyükkızoğlu

Group 13             : Besni, Derme, Erkenek, Kernek

Group 14             : Bayburt, Çemişgezek, Girlevik

Group 15             : Esendal, Işıklar (Visera)

Group 16             : Çağ Çağ, Otluca, Uludere,

Group 17             : Adilcevaz, Ahlat, Malazgirt, Varto-Sönmez

Group 18             : Engil, Erciş, Hoşap, Koçköprü

Group 19             : Arpaçay-Telek, Kiti

A tender was initiated by the PA on 13.07.2012 in 10 portfolios for the Run-of-River Power Plants of which their transfer operations could not be realized in the first tender and for Kısık, Berdan and Hasanlar HPPs which were included in the scope and program of privatization. 

The aforesaid portfolios have been determined as:

Group 1               : Engil, Erciş, Hoşap

Group 2               : Koçköprü

Group 3               : Kısık

Group 4               : Göksu

Group 5               : Bozkır, Ermenek

Group 6               : Haraklı-Hendek, Pazarköy-Akyazı, Bozhöyük

Group 7               : Hasanlar

Group 8               : Ladik-Büyükkızoğlu, Durucasu

Group 9               : Arpaçay, Telek-Kiti

Group 10             : Berdan

and the offers were received on 05.10.2012. Final negotiations of these tenders were completed on 19.10.2012. All the groups have been  privatized.

A tender was initiated by the PA on 24.03.2014 in 3 portfolios for the Run-of-River Power Plants of which their transfer operations could not be realized in the first tender.

The aforesaid portfolios have been determined as:

Group 1               : Esendal and Isıklar (Visera)

Group 2               :Kayaköy

Group 3               :Dere and İvriz

and the offers were received on 09.05.2014. Final negotiations of these tenders were completed on 21.05.2014. All the groups have been  privatized.

Ø  The Seyitömer Thermal Power Plant owned by Elektrik Üretim A.Ş. and immovable properties used by the plant, as well as movable and immovable properties used by Seyitömer Lignite Corporation have been  privatised by the “asset sale” method, while Licenses no. 2594, 31743 and 200702650 and mine fields covered by these licenses have been  privatised by the “transfer of operating rights” method as a whole. Sale and transfer of operating rights  agreement  was  signed on 17.06.2013 with the comparation of  Çelikler Seyitömer Elektrik Üretim A.Ş. , EÜAŞ and PA.

 

Ø  The Kangal Thermal Power Plant owned by Elektrik Üretim A.Ş. and immovable properties used by the plant and owned by Elektrik Üretim A.Ş. and the Treasury have been  privatised by the “asset sale” method, while Licenses no. 53318 and 72760 and mine fields covered by these licenses have been  privatised by the “transfer of operating rights” method as a whole. Sale and transfer of operating rights  agreement  was signed on 14.08.2013 with the comparation of  Kangal Termiksantral Elektrik Üretim A.Ş., EÜAŞ and PA.

 

Ø  Hamitabat Elektrik Üretim ve Tic. A.Ş. a subsidiary of Elektrik Üretim A.Ş.  have been privatised through a block sale by using the sale method of 100 % of  the shares . Sale agreement  was signed on 14.08.2013 between  Limak Doğalgaz Elektrik Üretim A.Ş.  and  PA.

 

Ø  The movable properties used by Yatağan Thermal Power Plant and Güney Ege Linyitleri İşletmesi (“GELİ”) owned by YEAŞ have been  privatized with the method of “Asset Sale”; the immovable properties used by Yatağan Thermal Power Plant, the immovable properties where GELİ is located on and the immovable properties used by GELİ have been privatized with the method of “Asset Sale”; the immovable properties placed at the Mine Fields covered by the relevant Mining Licenses have been privatized as a whole (“Yatağan Thermal Power Plant”) with the method of “Issuance of Operational Rights”. Sale and transfer of operating rights  agreement  was signed on 01.12.2014 with the comparation of  Yatağan Termik Enerji Üretim A.Ş., YEAŞ, EÜAŞ and PA.

 

Ø  Çatalağzı Thermal Power Plant owned by Elektrik Üretim A.Ş. and the immovable properties used by this power plant (“Çatalağzı Thermal Power Plant”) have been  privatized with the method of “Asset Sale”. Sale agreement  was signed on 22.12.2014 with the comparation of  Çates Elektrik Üretim A.Ş. , EÜAŞ and PA.

 

Ø  The movable properties used by Kemerköy Thermal Power Plant owned by Kemerköy Elektrik Üretim ve Ticaret A.Ş., Yeniköy Thermal Power Plant owned by Yatağan Elektrik Üretim ve Ticaret A.Ş. (“YEAŞ”), Yeniköy Linyit İşletmesi (“YLİ”), will be privatized with the method of “Asset Sale”; the immovable properties used by Kemerköy and Yeniköy Thermal Power Plant and the immovable properties used by YLİ have been  privatized with the method of “Asset Sale”; the immovable properties placed at the Mine Fields covered by the relevant Mining Licenses and Kemerköy Pier and its backcourt (“Kemerköy Port Area”) have been  privatized as a whole (“Kemerköy and Yeniköy Thermal Power Plant and Kemerköy Port Area”) with the method of “Issuance of Operational Rights”. Sale and transfer of operating rights  agreement of Kemerköy and Yeniköy Thermal Power Plant  was signed on 23.12.2014 with the comparation of  Yeniköy Kemerköy Elektrik Üretim ve Ticaret A.Ş., KEAŞ, YEAŞ, EÜAŞ and PA. Transfer of operating rights  agreement of Kemerköy Port Area was signed on 23.12.2014 with the comparation of Kemerköy Liman Hizmetleri A.Ş., KEAŞ and  Türkiye Denizcililik İşletmeleri A.Ş.

 

Ø  A tender was advertised on 23.09.2014 for the privatization of Orhaneli and Tunçbilek Thermal Power Plants owned by EÜAŞ, the movable properties used by Bursa Linyitleri İşletmesi (BLİ) owned by Soma Elektrik Üretim ve Ticaret A.Ş. (SEAŞ), the immovable properties used by Orhaneli and Tunçbilek Thermal Power Plants through the "Asset Sale" method and for the privatization of the Mining Licenses no. 79528 and 73021 and the Mining Fields covered by such licenses through the "Transfer of Operating Rights" method as a whole (“Orhaneli and Tunçbilek Thermal Power Plants”), and the final negotiations of the tender were done on 17.12.2014. With PHC's resolution no. 2015/14 dated 17.03.2015, the decision of the Tender Committee was approved. Within this framework, on 22.06.2015, PA, EÜAŞ and SEAŞ entered into a Sales and Transfer of Operating Rights Agreement with Çelikler Orhaneli Tunçbilek Elektrik Üretim A.Ş., which had been established by the Bidder in accordance with the provisions of the Tender Specifications and decided to be sold and transferred by PHC.

 

Ø  A tender was advertised on 23.09.2014 for the privatization of Soma B Thermal Power Plant (“Soma B Thermal Power Plant”) owned by Soma Elektrik Üretim ve Ticaret A.Ş. and the immovable properties used by Soma B TS following the "Asset Sales" method, and the final negotiation of the tender was completed on 13.01.2015. With PHC's resolution no. 2015/14 dated 17.03.2015, the decision of the Tender Committee was approved. Within this framework, on 22.06.2015, PA, EÜAŞ and SEAŞ entered into a Sales Agreement with Soma Termik Santral Elektrik Üretim A.Ş., which had been established by the Bidder in accordance with the provisions of the Tender Specifications and decided to be sold and transferred by PHC.

 

Power Plants which is ongoing tender process

 

Ø  A tender was initiated by the PA on 30.05.2014 in 1 portfolio for the Run-of-River Power Plants of which their transfer operations could not be realized in the first tender. The portfolio has been determined as Anamur, Bozyazi, Mut (Derinçay), Silifke and Zeyne. The offers were received 06.08.2014. Final negotiations were completed on 13.08.2014. Transfer process is going on.

Ø  Pursuant to PHC’s resolution no. 2015/55 dated 15.06.2015, PHC decided to put Hopa Thermal Power Plant, Bursa Natural Gas Power Plant and Aliağa Combined Cycle and Gas Turbine Power Plant as well as Kesikköprü, Derbent, Çamlıgöze, Köklüce, Almus, Yenice, Adıgüzel, Kemer, Karacaören 1, Karacaören 2, Kepez 2, Manavgat, Fethiye, Kadıncık 1, Kadıncık 2, Doğankent, Kürtün, Torul, Seyhan 1, Seyhan 2, Yüreğir, Kılavuzlu, Menzelet, Tortum, Çamlıca 1 and Şanlıurfa HEPPs into the program of privatization.

 

Ø  Pursuant to PHC's resolution no. 2015/55 dated 15.06.2015, a tender was advertised on 15.07.2015 for the privatization of Aliağa Combined Cycle and Gas Turbine Power Plant with an installed capacity of 180 MW and the immovable properties used by this Plant through the "Asset Sale" method, and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 01.10.2015.

 

Ø  Pursuant to PHC's resolution no. 2015/55 dated 15.06.2015, a tender was advertised on 15.07.2015 for the privatization of Bursa Natural Gas Power Plant with an installed capacity of 1,460 MW and the immovable properties used by this Plant through the "Asset Sale" method, and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 15.10.2015.

 

Ø  With PHC’s resolution no. 2015/55 dated 15.06.2015, the immovable properties used by Fethiye HEPP and Fethiye HEPP owned by EÜAŞ will be privatized by PA through the "Transfer of Operating Rights" method and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 05.10.2015.

 

Ø  With PHC’s resolution no. 2015/55 dated 15.06.2015, the immovable properties used by Kepez 2 and Manavgat HEPP and Kepez 2 and Manavgat HEPP owned by EÜAŞ will be privatized by PA through the "Transfer of Operating Rights" method and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 14.10.2015.

 

Ø  With PHC’s resolution no. 2015/55 dated 15.06.2015, the immovable properties used by Karacaören 1-2 and Karacaören 1-2 HEPP owned by EÜAŞ will be privatized by PA through the "Transfer of Operating Rights" method and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 27.10.2015.

 

Ø  With PHC’s resolution no. 2015/55 dated 15.06.2015, the immovable properties used by Kadıncık 1-2 HEPP and Kadıncık 1-2 HEPP owned by EÜAŞ will be privatized by PA through the "Transfer of Operating Rights" method and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 10.11.2015.

 

Ø  With PHC’s resolution no. 2015/55 dated 15.06.2015, the immovable properties used by Doğankent,Kürtün,Torul HEPP and Doğankent,Kürtün,Torul HEPP owned by EÜAŞ will be privatized by PA through the "Transfer of Operating Rights" method and the deadline for submitting pre-qualification and the bidding deadline were scheduled as 20.11.2015.

 

 

 

T.C. Başbakanlık Özelleştirme İdaresi Başkanlığı 2015