Auxiliary Units at Yarımca

STEAM GENERATION
UNIT
|
STEAM GENERATION UNIT |
|
|
|
Capacity |
: |
120 Tons/hour (40 tons/h x 3 BW) |
|
Licensor |
: |
BW.CE |
|
Engineering & Supply Contractor |
: |
SIM. Chem. U.K.,Tümaş-TURKEY |
|
Construction Contractor |
: |
Foster-Wheeler, U.S.A. |
|
Start up Date |
: |
07.04.1969 BW Boiler, 27.06.1973 CE Boiler |
|
Expansion Date |
: |
1975-1986 |
|
Capacity After Expansion |
: |
6 x 100 = 600 Tons/h |
|
XHS Production in 2000 |
: |
1.147.691 Tons |
|
AIR GENERATION UNIT
|
AIR GENERATION UNIT |
|
|
|
Capacity |
: |
5.000 Nm3/h |
|
Licensor |
: |
CENTAC |
|
Engineering & Supply Contractor |
: |
SIM. Chem. UK, Tümaş-TURKEY |
|
Construction Contractor |
: |
Foster-Wheeler, U.S.A. |
|
Start up Date |
: |
15 May 1969 |
|
Expansion Date |
: |
1972-1973 |
|
Capacity After Expansion |
: |
29.000 Nm3/h |
|
Production in 2000 |
: |
73.670.937 Nm3 |
NITROGEN GENERATION UNIT
|
NITROGEN GENERATION UNIT |
|
|
|
Capacity |
: |
840 Nm3/h |
|
Licensor |
: |
W.C. HOLMES |
|
Engineering & Supply Contractor |
: |
SIM. Chem. U.K., Tümaş-TURKEY |
|
Construction Contractor |
: |
Foster-Wheeler, U.S.A. |
|
Start up Date |
: |
05 May 1969 |
|
Expansion Date |
: |
1973 |
|
Capacity After Expansion |
: |
1.260 Nm3/h |
|
Production in 2000 |
: |
1.936.155 Nm3 |
|
|
|
|
|
|
|